18.6 mils, 1:09 moving time, 1,355 ft elevation
Brick started at the Rose Bowl with two friendly loops. Then, up Salvia Canyon, along Linda Vista to Lida. Up Lida, passing Art Center College of Design. Up Figueroa. Then, down along Chevy Chase – Highland – Linda Vista. A second loop up Lida and around.
Don’t miss next week’s special Transition Brick with BBQ! Arrive early for the workout; stay later for the food and friends!
Marco, PeterC, GT, Lunda, Allen, MikeO
Amy, Bill, Bryan, Marco, PeterC
PeterD, MIkeG, Michel, Steve. Not pictured: Todd, Joe, Graziano.